A customer cancels an order for 1000 units. The planner processes a transaction to reduce gross requirements by 1000 which immediately initiates a replan by MRP. Which MRP system is being used?
I. Regenerative
II. Net Change
答案解析
解析:
相关题目
BigRig company custom designs, manufactures, and constructs offshore oil drilling platforms. Production processes include fabrication of structural steel, loading on barges and final assembly of the platforms near the drilling site. Which of the following techniques would BigRig's production planning and control function be most likely to use?
Understanding the human and environmental aspects and impacts during the life of a product, process or service is called
The timing of project tasks and completion dates is displayed in a
Sources of load on work centers in a job shop include
Which of the following situation is true when capacity requirements planning determines that the load at a work center is within the capacity for the period?
A work center has an utilization of 90% and an efficiency of 95%, over the past months it has produced quantities of 600, 610, 640 and 630 per week. What is the demonstrated capacity of the work center?
The gateway work center performs the operation
A work center that is designated to produce a single item or a limited number of similar items is said to have
Using the information provided, what is the rated capacity of the work center?
Hours available: 7.2
Internal setup hours: 0.2
Standard hours produced: 7.0
Actual hours worked: 7.1
Scheduled downtime hours: 0.8
Hours per shift: 8
Shifts per day: 1
Days per week: 5.5
Number of resources: 20
The difference between capacity information used for capacity requirements planning as opposed to RCCP is