The gateway work center performs the operation
答案解析
解析:
相关题目
All of the following are user responsibilities in maintaining an MRP system EXCEPT:
The time periods of the master production schedule must be identical to the:
An MRP project team leader should report to the:
Which of the following is true regarding phantom bills of material and phantom parts?
I. It is a bill of material for a transient assembly.
II. A phantom is never closed to or issued from stock.
In a net change MRP system, all of the following can trigger a re-planning run except:
I. Changes in product structure
II. Inventory on-hand balance adjustments
III. Changes in lead time
Which of the following distinguishes a regenerative MRP system from a net change MRP system?
I. The frequency of the re-planning cycle
II. The technique used by the system to replan parts
A customer cancels an order for 1000 units. The planner processes a transaction to reduce gross requirements by 1000 which immediately initiates a replan by MRP. Which MRP system is being used?
I. Regenerative
II. Net Change
Manufacturing inventory is all of the following EXCEPT:
Which of the following is not generally considered as output from an MRP system?
I. Reschedule notices
II. Forecasts for items with independent demand
In a properly designed MRP system, which of the following objectives can be achieved?
I. Provide input to the capacity requirement planning module.
II. Maintain open order priorities.
III. Manage inventories properly.