The time periods of the master production schedule must be identical to the:
An MRP project team leader should report to the:
Which of the following is true regarding phantom bills of material and phantom parts?
I. It is a bill of material for a transient assembly.
II. A phantom is never closed to or issued from stock.
In a net change MRP system, all of the following can trigger a re-planning run except:
I. Changes in product structure
II. Inventory on-hand balance adjustments
III. Changes in lead time
Which of the following distinguishes a regenerative MRP system from a net change MRP system?
I. The frequency of the re-planning cycle
II. The technique used by the system to replan parts
A customer cancels an order for 1000 units. The planner processes a transaction to reduce gross requirements by 1000 which immediately initiates a replan by MRP. Which MRP system is being used?
I. Regenerative
II. Net Change
Manufacturing inventory is all of the following EXCEPT:
Which of the following is not generally considered as output from an MRP system?
I. Reschedule notices
II. Forecasts for items with independent demand
In a properly designed MRP system, which of the following objectives can be achieved?
I. Provide input to the capacity requirement planning module.
II. Maintain open order priorities.
III. Manage inventories properly.
Performance measures for senior managers need to be multidimensional. Which of the following best describes a multidimensional performance measure?