相关题目
In a net change MRP system, all of the following can trigger a re-planning run except:
I. Changes in product structure
II. Inventory on-hand balance adjustments
III. Changes in lead time
Which of the following distinguishes a regenerative MRP system from a net change MRP system?
I. The frequency of the re-planning cycle
II. The technique used by the system to replan parts
A customer cancels an order for 1000 units. The planner processes a transaction to reduce gross requirements by 1000 which immediately initiates a replan by MRP. Which MRP system is being used?
I. Regenerative
II. Net Change
Manufacturing inventory is all of the following EXCEPT:
Which of the following is not generally considered as output from an MRP system?
I. Reschedule notices
II. Forecasts for items with independent demand
In a properly designed MRP system, which of the following objectives can be achieved?
I. Provide input to the capacity requirement planning module.
II. Maintain open order priorities.
III. Manage inventories properly.
Performance measures for senior managers need to be multidimensional. Which of the following best describes a multidimensional performance measure?
Tasks within and across small work groups are called:
When creating measurements, what seems to be the maximum number of measures per criteria? (e.g. Flexibility, Quality, etc)
Traditional cost systems focus on capturing direct material and direct labor costs while summarizing all other costs as a percentage of the direct labor hours. While this method of accounting conforms to GAAP (generally accepted accounting principles) accounting standards, it does not provide the necessary information for managers to effectively run their operations. Which of the following is one of the reasons traditional accounting is not useful to measure operations?
