单选题

Which of the following situation is true when capacity requirements planning determines that the load at a work center is within the capacity for the period?

A
Overloads in adjacent periods can be moved to the period that is underloaded
B
This is not a key work center and should be removed from the capacity requirements planning
C
The material plan is balanced, and both start and completion date will likely be met
D
More orders can be added to the MPS

答案解析

正确答案:C

解析:

The purpose of CRP is to verify that the material plan is balanced with capacity, there is no indication that there is an under-load condition;
CPIM PART2-供应链资格认证考试

扫码进入小程序
随时随地练习

相关题目

单选题

An MRP project team leader should report to the:

单选题

Which of the following is true regarding phantom bills of material and phantom parts?
I. It is a bill of material for a transient assembly.
II. A phantom is never closed to or issued from stock.

单选题

In a net change MRP system, all of the following can trigger a re-planning run except:
I. Changes in product structure
II. Inventory on-hand balance adjustments
III. Changes in lead time

单选题

Which of the following distinguishes a regenerative MRP system from a net change MRP system?
I. The frequency of the re-planning cycle
II. The technique used by the system to replan parts

单选题

A customer cancels an order for 1000 units. The planner processes a transaction to reduce gross requirements by 1000 which immediately initiates a replan by MRP. Which MRP system is being used?
I. Regenerative
II. Net Change

单选题

Manufacturing inventory is all of the following EXCEPT:

单选题

Which of the following is not generally considered as output from an MRP system?
I. Reschedule notices
II. Forecasts for items with independent demand

单选题

In a properly designed MRP system, which of the following objectives can be achieved?
I. Provide input to the capacity requirement planning module.
II. Maintain open order priorities.
III. Manage inventories properly.

单选题

Performance measures for senior managers need to be multidimensional. Which of the following best describes a multidimensional performance measure?

单选题

Tasks within and across small work groups are called:

关闭登录弹窗
专为自学备考人员打造
勾选图标
自助导入本地题库
勾选图标
多种刷题考试模式
勾选图标
本地离线答题搜题
勾选图标
扫码考试方便快捷
勾选图标
海量试题每日更新
波浪装饰图
欢迎登录试题通
可以使用以下方式扫码登陆
APP图标
使用APP登录
微信图标
使用微信登录
试题通小程序二维码
联系电话:
400-660-3606
试题通企业微信二维码