A bottleneck work station capacity is loaded to 90% of available capacity, but 1 of the 2 machines is down for a 2-week repair. Which of the following results is expected to occur at operations downstream from the bottleneck?
答案解析
解析:
相关题目
A panel of experts are assembled and asked to fill out questionnaires about your business. The questionnaires are then used to produce another set of questionnaires which are then distributed to the panel again. Which forecasting method is being used?
Long-range forecasts are associated with which of the following techniques?
I. A small number of products or families
II. Recurring or periodic data
III. Qualitative techniques are used more frequently than short range forecasts
IV. External data
If the sum of the forecast errors is 100 for four periods, what should the safety stock level be for a 95% service level? (Round to nearest whole number)
Every company should have a set of functional plans synchronizing activities across functions that specify production levels, capacity levels, staffing levels, funding levels, etc. to achieve the intermediate goals and objectives of the organization. This plan would be called the:
A distribution network structure is the:
In a make-to-stock company, distribution will divide the number of items (or dollars) shipped by the number of items (or dollars) that were supposed to ship. This measure is called the:
Which of the following environments would have the lowest production volume of each sales unit?
Which of the following is not a key element of demand management?
Which of the following is the primary role for demand management?
In a manufacturing facility, the MRP system uses the manufacturing lead time to calculate the start time of an order. In a DRP system, the lead time used in the system is the:
