In a manufacturing facility, the MRP system uses the manufacturing lead time to calculate the start time of an order. In a DRP system, the lead time used in the system is the:
答案解析
解析:
相关题目
A downsized associated with linking corporate financial incentives to specific performance objectives is that
W/proper lot sizing, operation overlapping will
Standard activities producing differing results is an example of
Backward scheduling work center A
Move time between operations = 1 day
Wait time = 1 day
Due date is day 100
Operation Work center Operation time Queue time
10 A 2 5
20 B 4 3
30 C 2 1
A characteristic of a lean enterprise strategy is
If a point is outside of the upper control limit, which of the following statements is most applicable to the process?
Which of the following management philosophies is least likely to focus on throughput?
A line works 8 hour shift per day, 5 days a week. If the demand is 960 units per day, the takt time is
Feedback of production information in a company using Kanban is most likely to exclude
A bottleneck work station capacity is loaded to 90% of available capacity, but 1 of the 2 machines is down for a 2-week repair. Which of the following results is expected to occur at operations downstream from the bottleneck?