A distribution network structure is the:
答案解析
解析:
相关题目
If a point is outside of the upper control limit, which of the following statements is most applicable to the process?
Which of the following management philosophies is least likely to focus on throughput?
A line works 8 hour shift per day, 5 days a week. If the demand is 960 units per day, the takt time is
Feedback of production information in a company using Kanban is most likely to exclude
A bottleneck work station capacity is loaded to 90% of available capacity, but 1 of the 2 machines is down for a 2-week repair. Which of the following results is expected to occur at operations downstream from the bottleneck?
Which of the following functions does the drum-buffer-rope (DBR) method perform?
The most important reason for reporting and knowing throughput is
A product can be produced at a rate of 2 per minute, this is know as
Which of the following activities is an attempt to ensure that material is available in advance of need by production?
In a standard cost environment, which of the following labor reporting is most important to a continuous improvement program?
