Every company should have a set of functional plans synchronizing activities across functions that specify production levels, capacity levels, staffing levels, funding levels, etc. to achieve the intermediate goals and objectives of the organization. This plan would be called the:
答案解析
解析:
相关题目
Which of the following management philosophies is least likely to focus on throughput?
A line works 8 hour shift per day, 5 days a week. If the demand is 960 units per day, the takt time is
Feedback of production information in a company using Kanban is most likely to exclude
A bottleneck work station capacity is loaded to 90% of available capacity, but 1 of the 2 machines is down for a 2-week repair. Which of the following results is expected to occur at operations downstream from the bottleneck?
Which of the following functions does the drum-buffer-rope (DBR) method perform?
The most important reason for reporting and knowing throughput is
A product can be produced at a rate of 2 per minute, this is know as
Which of the following activities is an attempt to ensure that material is available in advance of need by production?
In a standard cost environment, which of the following labor reporting is most important to a continuous improvement program?
Pull systems have which of the following advantages over push systems?