Which of the following environments would have the lowest production volume of each sales unit?
答案解析
解析:
相关题目
Backward scheduling work center A
Move time between operations = 1 day
Wait time = 1 day
Due date is day 100
Operation Work center Operation time Queue time
10 A 2 5
20 B 4 3
30 C 2 1
A characteristic of a lean enterprise strategy is
If a point is outside of the upper control limit, which of the following statements is most applicable to the process?
Which of the following management philosophies is least likely to focus on throughput?
A line works 8 hour shift per day, 5 days a week. If the demand is 960 units per day, the takt time is
Feedback of production information in a company using Kanban is most likely to exclude
A bottleneck work station capacity is loaded to 90% of available capacity, but 1 of the 2 machines is down for a 2-week repair. Which of the following results is expected to occur at operations downstream from the bottleneck?
Which of the following functions does the drum-buffer-rope (DBR) method perform?
The most important reason for reporting and knowing throughput is
A product can be produced at a rate of 2 per minute, this is know as