A line works 8 hour shift per day, 5 days a week. If the demand is 960 units per day, the takt time is
Feedback of production information in a company using Kanban is most likely to exclude
A bottleneck work station capacity is loaded to 90% of available capacity, but 1 of the 2 machines is down for a 2-week repair. Which of the following results is expected to occur at operations downstream from the bottleneck?
Which of the following functions does the drum-buffer-rope (DBR) method perform?
The most important reason for reporting and knowing throughput is
A product can be produced at a rate of 2 per minute, this is know as
Which of the following activities is an attempt to ensure that material is available in advance of need by production?
In a standard cost environment, which of the following labor reporting is most important to a continuous improvement program?
Pull systems have which of the following advantages over push systems?
A significant difference between absorptions and variable costing is that the variable costing