Which of the following is not generally considered as output from an MRP system?
I. Reschedule notices
II. Forecasts for items with independent demand
答案解析
解析:
相关题目
The best way to monitor the completion of a project's time and budget is
A network analysis technique in which each activity is assigned a pessimistic, most likely, and optimistic estimate of its duration is called the
BigRig company custom designs, manufactures, and constructs offshore oil drilling platforms. Production processes include fabrication of structural steel, loading on barges and final assembly of the platforms near the drilling site. Which of the following techniques would BigRig's production planning and control function be most likely to use?
Understanding the human and environmental aspects and impacts during the life of a product, process or service is called
The timing of project tasks and completion dates is displayed in a
Sources of load on work centers in a job shop include
Which of the following situation is true when capacity requirements planning determines that the load at a work center is within the capacity for the period?
A work center has an utilization of 90% and an efficiency of 95%, over the past months it has produced quantities of 600, 610, 640 and 630 per week. What is the demonstrated capacity of the work center?
The gateway work center performs the operation
A work center that is designated to produce a single item or a limited number of similar items is said to have