MRP has calculated a gross demand of 50 units in period 4. The net requirement and safety stock are 0. The order quantity is 100 units, if the next net demand is 20 units in period 6.
答案解析
相关题目
Incoming inspection is now being replaced by what?
Which of the following are NOT benefits to concurrent engineering?
Which of the following is NOT a way to establish capacity?
When a supplier agrees to supply their parts and the customer will use them is called what type of partnering?
If part A is a parent of part 6 and part B then part 6 is what to part A?
What type of scheduling uses a particular operation to schedule from?
Company ABC is trying to calculate how much safety stock they should have for their highest selling product. With the following info calculate the safety stock.
Standard Deviation = 25
Safety Factor = 4.00
Lead Time = 4 weeks
Forecast of 250 per week
Which of the following is NOT included in manufacturing lead time elements?
When a non-bottleneck stops, what supply's the bottleneck work center?
Which of the following are basic methods of managing a contract?
1. Vendor scheduling
2. Direct shipment
3. Release system