Which of the following are NOT benefits to concurrent engineering?
答案解析
解析:
1. Time to market is shorter
2. Overall cost is lower
3. Number of engineering changes is less
4. Manufacturing can produce a higher quality product consistently
相关题目
A company makes products with multiple options and is experiencing a temporary increase in sales, which of the following inventories should be in store?
MRP has calculated a gross demand of 50 units in period 4. The net requirement and safety stock are 0. The order quantity is 100 units, if the next net demand is 20 units in period 6.
A material planner is most likely to need to take manual action if
To override the MPR logic for quantity or date of a planned orders, the planner should use
A performance objective of MRP would be a reduction of
Using phantom BOM will result in a reduction in
There is available inventory 100 units of a component. There are 5 parent orders that each require 100 of the component for a total requirement of 500 units, the 5 end items are being produced to a forecast and not actual demand is known. Which of the following actions is the planner most probably to do?
A primary advantage of MPR over reorder point for determining replenishment order timing in a MTO environment is?
Items that have been assigned to specific orders but have not yet been released from the stockroom to production are referred to as
In an MTO environment, what is most likely to be used to convert product demand into MRP over the planning horizon?