When a supplier agrees to supply their parts and the customer will use them is called what type of partnering?
答案解析
解析:
相关题目
Pegging is used to
Which of the following features are characteristic of continuous process manufacturing?
1. Low-cost production
2. Multipurpose process technology
3. Price as an order-winning criterion
4. Narrow product range
A company makes products with multiple options and is experiencing a temporary increase in sales, which of the following inventories should be in store?
MRP has calculated a gross demand of 50 units in period 4. The net requirement and safety stock are 0. The order quantity is 100 units, if the next net demand is 20 units in period 6.
A material planner is most likely to need to take manual action if
To override the MPR logic for quantity or date of a planned orders, the planner should use
A performance objective of MRP would be a reduction of
Using phantom BOM will result in a reduction in
There is available inventory 100 units of a component. There are 5 parent orders that each require 100 of the component for a total requirement of 500 units, the 5 end items are being produced to a forecast and not actual demand is known. Which of the following actions is the planner most probably to do?
A primary advantage of MPR over reorder point for determining replenishment order timing in a MTO environment is?