What type of scheduling uses a particular operation to schedule from?
答案解析
解析:
相关题目
In an ETO environment, what determines the latest point at which the BOM can be completed and released to MRP?
The primary purpose of the BOM in the MRP process is
Pegging is used to
Which of the following features are characteristic of continuous process manufacturing?
1. Low-cost production
2. Multipurpose process technology
3. Price as an order-winning criterion
4. Narrow product range
A company makes products with multiple options and is experiencing a temporary increase in sales, which of the following inventories should be in store?
MRP has calculated a gross demand of 50 units in period 4. The net requirement and safety stock are 0. The order quantity is 100 units, if the next net demand is 20 units in period 6.
A material planner is most likely to need to take manual action if
To override the MPR logic for quantity or date of a planned orders, the planner should use
A performance objective of MRP would be a reduction of
Using phantom BOM will result in a reduction in