A material planner is most likely to need to take manual action if
答案解析
解析:
Firmed planned orders have already been firmed for date and quantity, so likely will not be changed;
Planned orders do not require any planner action;
Allocated material picking does not affect MRP calculations;
相关题目
Which of the following would be included in the item master file?
I. Manufacturing Lead Time
II. Quantity on Order
III. Safety Stock
IV. Balance on Hand
Incoming inspection is now being replaced by what?
Which of the following are NOT benefits to concurrent engineering?
Which of the following is NOT a way to establish capacity?
When a supplier agrees to supply their parts and the customer will use them is called what type of partnering?
If part A is a parent of part 6 and part B then part 6 is what to part A?
What type of scheduling uses a particular operation to schedule from?
Company ABC is trying to calculate how much safety stock they should have for their highest selling product. With the following info calculate the safety stock.
Standard Deviation = 25
Safety Factor = 4.00
Lead Time = 4 weeks
Forecast of 250 per week
Which of the following is NOT included in manufacturing lead time elements?
When a non-bottleneck stops, what supply's the bottleneck work center?