Which of the following would be included in the item master file?
I. Manufacturing Lead Time
II. Quantity on Order
III. Safety Stock
IV. Balance on Hand
答案解析
解析:
1. Manufacturing Lead Time
2. Balance on Hand3. Quantity Allocated
4. Quantity on Order
5. Order Quantity
Safety stock would not be included in the item master file.
相关题目
A material planner is most likely to need to take manual action if
To override the MPR logic for quantity or date of a planned orders, the planner should use
A performance objective of MRP would be a reduction of
Using phantom BOM will result in a reduction in
There is available inventory 100 units of a component. There are 5 parent orders that each require 100 of the component for a total requirement of 500 units, the 5 end items are being produced to a forecast and not actual demand is known. Which of the following actions is the planner most probably to do?
A primary advantage of MPR over reorder point for determining replenishment order timing in a MTO environment is?
Items that have been assigned to specific orders but have not yet been released from the stockroom to production are referred to as
In an MTO environment, what is most likely to be used to convert product demand into MRP over the planning horizon?
It is important for a material planner to know which of the following demand information from the MPS?
A purchased component has a net requirements in period 4. It has a 6-period lead time and no schedule receipts. Which of the following actions would be the result of MRP?
