To override the MPR logic for quantity or date of a planned orders, the planner should use
答案解析
解析:
相关题目
Which of the following are mathematical models to help maximize or minimize an objective (Profit, resources, capacity, etc)
I. Linear programs
II. Project programs
III. Non-Linear Programming
Which of the following would be included in the item master file?
I. Manufacturing Lead Time
II. Quantity on Order
III. Safety Stock
IV. Balance on Hand
Incoming inspection is now being replaced by what?
Which of the following are NOT benefits to concurrent engineering?
Which of the following is NOT a way to establish capacity?
When a supplier agrees to supply their parts and the customer will use them is called what type of partnering?
If part A is a parent of part 6 and part B then part 6 is what to part A?
What type of scheduling uses a particular operation to schedule from?
Company ABC is trying to calculate how much safety stock they should have for their highest selling product. With the following info calculate the safety stock.
Standard Deviation = 25
Safety Factor = 4.00
Lead Time = 4 weeks
Forecast of 250 per week
Which of the following is NOT included in manufacturing lead time elements?