In order for manufacturing planning systems to work properly, lead times in the system must be dependable. This means that queues must be under control. There are three reasons why queues are out of control. Which of the following is NOT a reason for out of control queues?

A
Not measuring capacity in a correct unit of measure
B
Inadequate capacity
C
Erratic input of jobs to the floor
D
Inflated lead times to allow more time for job completion

答案解析

正确答案:A

解析:

There are three reasons for out-of-control queues: inadequate capacity, erratic input of jobs to the floor, and inflated lead times.
Inadequate capacity -- If you cannot make enough in total, queues will grow and lead times will get longer.
Erratic input -- the ordering system will release work in a lumpy manner. As a result, the lot will not necessarily move smoothly through the factory causing queues to increase.
Inflated lead times -- inflating lead times cause new orders to be planned and dumps more load on the factory without regard of the capability to handle the load.
CPIM PART2-供应链资格认证考试

扫码进入小程序
随时随地练习

关闭登录弹窗
专为自学备考人员打造
勾选图标
自助导入本地题库
勾选图标
多种刷题考试模式
勾选图标
本地离线答题搜题
勾选图标
扫码考试方便快捷
勾选图标
海量试题每日更新
波浪装饰图
欢迎登录试题通
可以使用以下方式扫码登陆
APP图标
使用APP登录
微信图标
使用微信登录
试题通小程序二维码
联系电话:
400-660-3606
试题通企业微信二维码