Loads in CRP in a well-run company are fairly balanced in the short-term but are dropping off later in the planning horizon. The most likely reason is
答案解析
解析:
相关题目
A listing of the required capacity and key resources needed to manufacture one unit of a selected item or family is best defined as:
When there are make-to-order and make-to-stock parts being manufactured using a single set of plant and equipment, it is known as:
Advanced planning and scheduling systems determine the optimal schedule by eliminating:
A process train is a representation of the flow of materials through a process industry manufacturing system. Within this process train, equipment that performs a basic manufacturing step, such as mixing or packaging is called a:
In a flow factory, the capacity of a work cell would be established by:
In order for manufacturing planning systems to work properly, lead times in the system must be dependable. This means that queues must be under control. There are three reasons why queues are out of control. Which of the following is NOT a reason for out of control queues?
Using the "bath tub" to represent a work center, the water in the tub would represent:
Capacity requirements planning (CRP) differs from rough cut capacity planning (RCCP) in four respects. Which of the following is not a difference between CRP and RCCP?
The capacity requirements process is an infinite loading technique. This means that:
Which of the following would be an objective of capacity requirements planning?