相关题目
In a flow factory, the capacity of a work cell would be established by:
In order for manufacturing planning systems to work properly, lead times in the system must be dependable. This means that queues must be under control. There are three reasons why queues are out of control. Which of the following is NOT a reason for out of control queues?
Using the "bath tub" to represent a work center, the water in the tub would represent:
Capacity requirements planning (CRP) differs from rough cut capacity planning (RCCP) in four respects. Which of the following is not a difference between CRP and RCCP?
The capacity requirements process is an infinite loading technique. This means that:
Which of the following would be an objective of capacity requirements planning?
The ability of a system to automatically trace the requirements for a given component up the bill structure to the source of the requirement is referred to as:
Planning factors used in the item master record include all of the following EXCEPT:
Which of the following outputs would be used as input to capacity requirements planning?
Which of the following is/are a cost of inventory?
