If a work center is overstated in terms of available production capacity
答案解析
解析:
相关题目
Which of the following is used in conjunction with time phased MRP records and shop floor system records to calculate the capacity needed to produce both open shop orders and planned orders?
A listing of the required capacity and key resources needed to manufacture one unit of a selected item or family is best defined as:
When there are make-to-order and make-to-stock parts being manufactured using a single set of plant and equipment, it is known as:
Advanced planning and scheduling systems determine the optimal schedule by eliminating:
A process train is a representation of the flow of materials through a process industry manufacturing system. Within this process train, equipment that performs a basic manufacturing step, such as mixing or packaging is called a:
In a flow factory, the capacity of a work cell would be established by:
In order for manufacturing planning systems to work properly, lead times in the system must be dependable. This means that queues must be under control. There are three reasons why queues are out of control. Which of the following is NOT a reason for out of control queues?
Using the "bath tub" to represent a work center, the water in the tub would represent:
Capacity requirements planning (CRP) differs from rough cut capacity planning (RCCP) in four respects. Which of the following is not a difference between CRP and RCCP?
The capacity requirements process is an infinite loading technique. This means that:
