A final assembly schedule is the final schedule of what will be assembled to meet the customers order. The final assembly schedule should be completed:
答案解析
解析:
相关题目
Which of the following scenarios are most indicated in a participative design environment?
Which of the following actions provide visibility of flow in a lean production environment?
At one time a high-end automobile had 97 components, after an out-of-the-box evaluation, the number was reduced to 7 parts, this part reduction is a key goal of
If a company's design cycle is less than that of its competitors, which of the following statements would most likely be true?
Universal power supplies that can be set to different voltages based on the country the customer resides in is a sample of
A supplier that provides 100% acceptable quality products is providing
An effective way to improve the capability of production process equipment is
Visual management supports continuous improvement in which of the following ways?
Conveyors used as part of an assembly operation should be
A supplier has access to a customer's inventory data and is responsible for maintaining the inventory level required by a customer. The vendor reviews inventory on-site at the customer's location, restocks and then invoices the customer. The inventory is termed