Visual management supports continuous improvement in which of the following ways?
答案解析
解析:
相关题目
Which of the following is affected when input does not match output?
I. Lot sizes
II. Lead times
III. Queue sizes
Which of the following actions should the master scheduler take if the ATP line shows a negative balance?
All of the following would be good measures of MPS achievement except:
Which of the following would be most useful in determining the production planning horizon?
Which of the following problems can be corrected at the rough-cut capacity planning level?
I. Overloads at critical work centers
II. Excess capacity at any work center
III. Excess load versus plant capacity
Which of the following statements is true about the master production schedule?
The use of modular bills of material allows the master production schedule to:
A final assembly schedule is the final schedule of what will be assembled to meet the customers order. The final assembly schedule should be completed:
All of the following benefits result from master scheduling EXCEPT:
Planning bills are referred to as pseudo bills. This reference occurs because they:
