Which of the following scenarios are most indicated in a participative design environment?
答案解析
解析:
相关题目
A final assembly schedule is the final schedule of what will be assembled to meet the customers order. The final assembly schedule should be completed:
All of the following benefits result from master scheduling EXCEPT:
Planning bills are referred to as pseudo bills. This reference occurs because they:
All of the following are outputs from the Sales and Operations Planning process EXCEPT:
Master schedule changes inside the firm zone must be managed. These changes should be authorized by the:
Which of the following functions should be involved with the development of the production plan?
I. Marketing
II. Manufacturing
III. Finance
Which of the following would be a symptom of a mismanaged master schedule?
I. The capacity plan is level loaded.
II. The on-time delivery rate is less than 90%.
III. Lead times in the factory are excessively short.
IV. Past due shop orders occasionally occur.
Which of the following statements are true regarding master scheduling?
I. In make-to-stock production environments, component assembly lead time is firm.
II. In make-to-order production environments, final assembly lead time is firm.
III. In assemble-to-order production environments, assembly lead time is firm.
IV. In make-to-stock production environments, order process and shipping lead times are free.
Which of the following are objectives of the master schedule?
I. A level repeating schedule
II. Changes are kept to a minimum
III. The schedule sums to the production plan
IV. Maintain planning bills
Which of the following statements are true regarding the final assembly schedule?
I. It is a statement of the exact set of end products to be built.
II. It controls the manufacturing from fabricated products to shippable products.
III. It schedules the purchase of components not under MPS control which are needed for final assembly.