Which of the following actions provide visibility of flow in a lean production environment?
答案解析
解析:
相关题目
The use of modular bills of material allows the master production schedule to:
A final assembly schedule is the final schedule of what will be assembled to meet the customers order. The final assembly schedule should be completed:
All of the following benefits result from master scheduling EXCEPT:
Planning bills are referred to as pseudo bills. This reference occurs because they:
All of the following are outputs from the Sales and Operations Planning process EXCEPT:
Master schedule changes inside the firm zone must be managed. These changes should be authorized by the:
Which of the following functions should be involved with the development of the production plan?
I. Marketing
II. Manufacturing
III. Finance
Which of the following would be a symptom of a mismanaged master schedule?
I. The capacity plan is level loaded.
II. The on-time delivery rate is less than 90%.
III. Lead times in the factory are excessively short.
IV. Past due shop orders occasionally occur.
Which of the following statements are true regarding master scheduling?
I. In make-to-stock production environments, component assembly lead time is firm.
II. In make-to-order production environments, final assembly lead time is firm.
III. In assemble-to-order production environments, assembly lead time is firm.
IV. In make-to-stock production environments, order process and shipping lead times are free.
Which of the following are objectives of the master schedule?
I. A level repeating schedule
II. Changes are kept to a minimum
III. The schedule sums to the production plan
IV. Maintain planning bills