All of the following would be good measures of MPS achievement except:
Which of the following would be most useful in determining the production planning horizon?
Which of the following problems can be corrected at the rough-cut capacity planning level?
I. Overloads at critical work centers
II. Excess capacity at any work center
III. Excess load versus plant capacity
Which of the following statements is true about the master production schedule?
The use of modular bills of material allows the master production schedule to:
A final assembly schedule is the final schedule of what will be assembled to meet the customers order. The final assembly schedule should be completed:
All of the following benefits result from master scheduling EXCEPT:
Planning bills are referred to as pseudo bills. This reference occurs because they:
All of the following are outputs from the Sales and Operations Planning process EXCEPT:
Master schedule changes inside the firm zone must be managed. These changes should be authorized by the: