Which of the following are included in a closed loop MRP system?
I. Master Production Scheduling
II. Capacity Requirement Planning
III. Purchasing
答案解析
解析:
相关题目
Engineering has suggested that a company's products would provide more value to customers if they were capable of identifying and automatically reporting problems to service and repair associates. The most likely effect of this strategy would be
A fault tree analysis may also be described as which of thee following types of analyses?
A company that transitions from sequential product development to concurrent engineering typically experiences which of the following outcomes?
1. Betterfit of products to production capabilities;
2. Increased influence by manufacturing engineering over design decisions;
3. Reduced variety of product components;
In order to better serve its customer needs, a manufacturer wants to change the design of one of its products, while minimizing time to market, this could best be accomplished with
The mitigate a potential catastrophic failure, companies may resort to executing
Program useful in bringing a new product to market faster is
Early customer involvement in the design process can result in
A quality management technique that measures controllable and uncontrollable process variables and their effects on managing satisfactory outputs from the process is called
Waste at the supplier can be eliminated by using
A company is performing a quality audit on a supplier that is process-oriented and has an excellent reputation. The company should audit which concept at the supplier?
