AI智能推荐题库-试题通 AI智能整理导入题库-试题通
×
首页 题库中心 CPIM PART2-供应链资格认证考试 题目详情
C93BF00FBEF00001B89720C0D4CE1712
CPIM PART2-供应链资格认证考试
3,028
单选题

A fault tree analysis may also be described as which of thee following types of analyses?

A
Potential cause
B
Risk mitigation
C
Post-failure
D
Operations resilience

答案解析

正确答案:B

解析:

A fault tree analysis is defined as a logical approach to identify the probabilities and frequencies of events in a system that are most critical to uninterrupted and safe operation, including the 2 points below:
1. Failure mode effect analysis --Determining the result of component failure interactions toward system safety;
2. Techniques for human error prediction;
***Risk mitigation is a strategy to prepare for and lessen the effects of threats faced by a business. Comparable to risk reduction, risk mitigation takes steps to reduce the negative effects of threats and disasters on business continuity (BC).
Operational resilience is your business’ ability to change or adapt during times of stress, disruption, or uncertainty. It’s also a key factor for success — and employee morale — in these turbulent times.
题目纠错
CPIM PART2-供应链资格认证考试

扫码进入小程序
随时随地练习

相关题目

单选题

Which of the following will result from the level strategy of production planning?
I. Production occurs at exactly the same rate as the sales forecast for each period.
II. Inventory will generally build.
III. The labor force and capacity usage remains stable.

单选题

Which of the following are included in a closed loop MRP system?
I. Master Production Scheduling
II. Capacity Requirement Planning
III. Purchasing

单选题

Period: 1 2 3 4 5
Forecast: 10 10 10 20 20
Orders: 8 6 6 2 2
PAB
MPS 30 0 0 0 0
On Hand 20
Based on the above MPS record, what is the non-cumulative ATP in Period 1?

单选题

Which of the following pieces of information must be available in order to prepare a realistic MPS?
I. Knowledge of all production requirements
II. Available capacity
III. Load profile of each MPS item

单选题

Which of the following statements are true regarding production planning?
I. It is senior management's responsibility.
II. The master scheduler should "disaggregate" the production plan to the master schedule.
III. It focuses corporate production goals.

单选题

If the master production schedule is overstated, which of the following will occur?

单选题

The frequency of revisions to a forecast should be:

单选题

Which of the following would be the best way to cope with the uncertainty of demand?

单选题

There are a multitude of customer measures in use today. Which of the following would best describe what should be measured?

单选题

The production plan needs to be expressed in meaningful units that everyone understands. It also needs to be expressed in a manageable number of units. The best number of product groups or families would be:

关闭登录弹窗
专为自学备考人员打造
勾选图标
自助导入本地题库
勾选图标
多种刷题考试模式
勾选图标
本地离线答题搜题
勾选图标
扫码考试方便快捷
勾选图标
海量试题每日更新
波浪装饰图
欢迎登录试题通
可以使用以下方式扫码登陆
APP图标
使用APP登录
微信图标
使用微信登录
试题通小程序二维码
联系电话:
400-660-3606
试题通企业微信二维码