A quality management technique that measures controllable and uncontrollable process variables and their effects on managing satisfactory outputs from the process is called

A
Design for quality
B
design for manufacturability
C
design for the environment
D
design for experiments

答案解析

正确答案:D

解析:

DOE is a quality management technique used to evaluate the effect of carefully planned and controlled changes to input process variables on the output variable. The objective is to improve production processes;
题目纠错
CPIM PART2-供应链资格认证考试

扫码进入小程序
随时随地练习

相关题目

单选题

Which of the following statements are true regarding master scheduling?
I. In make-to-stock production environments, component assembly lead time is firm.
II. In make-to-order production environments, final assembly lead time is firm.
III. In assemble-to-order production environments, assembly lead time is firm.
IV. In make-to-stock production environments, order process and shipping lead times are free.

单选题

Which of the following are objectives of the master schedule?
I. A level repeating schedule
II. Changes are kept to a minimum
III. The schedule sums to the production plan
IV. Maintain planning bills

单选题

Which of the following statements are true regarding the final assembly schedule?
I. It is a statement of the exact set of end products to be built.
II. It controls the manufacturing from fabricated products to shippable products.
III. It schedules the purchase of components not under MPS control which are needed for final assembly.

单选题

The rough-cut capacity plan will differ from the resource plan in which of the following ways?
I. The rough-cut capacity plan is less detailed than the resource plan.
II. The rough-cut capacity plan considers more production resources.
III. Lead times are offset in the rough-cut capacity plans.
IV. Rough-cut plans are displayed in months or quarters.

单选题

In which of the following environments will the final assembly schedule normally correspond to the MPS?
I. Make-to-stock
II. Make-to-order
III. Assemble-to-order

单选题

The major advantage of a two level MPS process is which of the following?

单选题

Which of the following will result from the level strategy of production planning?
I. Production occurs at exactly the same rate as the sales forecast for each period.
II. Inventory will generally build.
III. The labor force and capacity usage remains stable.

单选题

Which of the following are included in a closed loop MRP system?
I. Master Production Scheduling
II. Capacity Requirement Planning
III. Purchasing

单选题

Period: 1 2 3 4 5
Forecast: 10 10 10 20 20
Orders: 8 6 6 2 2
PAB
MPS 30 0 0 0 0
On Hand 20
Based on the above MPS record, what is the non-cumulative ATP in Period 1?

单选题

Which of the following pieces of information must be available in order to prepare a realistic MPS?
I. Knowledge of all production requirements
II. Available capacity
III. Load profile of each MPS item

关闭登录弹窗
专为自学备考人员打造
勾选图标
自助导入本地题库
勾选图标
多种刷题考试模式
勾选图标
本地离线答题搜题
勾选图标
扫码考试方便快捷
勾选图标
海量试题每日更新
波浪装饰图
欢迎登录试题通
可以使用以下方式扫码登陆
APP图标
使用APP登录
微信图标
使用微信登录
试题通小程序二维码
联系电话:
400-660-3606
试题通企业微信二维码