Engineering has suggested that a company's products would provide more value to customers if they were capable of identifying and automatically reporting problems to service and repair associates. The most likely effect of this strategy would be

A
More frequent on-site service thus increasing costs overall
B
Increasing customer up time, reducing customer repair costs
C
To enhance the product's order qualifying features
D
A marketing feature that will facilitate moving selling prices higher

答案解析

正确答案:B
题目纠错
CPIM PART2-供应链资格认证考试

扫码进入小程序
随时随地练习

相关题目

单选题

Which of the following are included in a closed loop MRP system?
I. Master Production Scheduling
II. Capacity Requirement Planning
III. Purchasing

单选题

Period: 1 2 3 4 5
Forecast: 10 10 10 20 20
Orders: 8 6 6 2 2
PAB
MPS 30 0 0 0 0
On Hand 20
Based on the above MPS record, what is the non-cumulative ATP in Period 1?

单选题

Which of the following pieces of information must be available in order to prepare a realistic MPS?
I. Knowledge of all production requirements
II. Available capacity
III. Load profile of each MPS item

单选题

Which of the following statements are true regarding production planning?
I. It is senior management's responsibility.
II. The master scheduler should "disaggregate" the production plan to the master schedule.
III. It focuses corporate production goals.

单选题

If the master production schedule is overstated, which of the following will occur?

单选题

The frequency of revisions to a forecast should be:

单选题

Which of the following would be the best way to cope with the uncertainty of demand?

单选题

There are a multitude of customer measures in use today. Which of the following would best describe what should be measured?

单选题

The production plan needs to be expressed in meaningful units that everyone understands. It also needs to be expressed in a manageable number of units. The best number of product groups or families would be:

单选题

If a company would like to build up inventory to meet an expected seasonal demand, the inventory increase would first be loaded to the:

关闭登录弹窗
专为自学备考人员打造
勾选图标
自助导入本地题库
勾选图标
多种刷题考试模式
勾选图标
本地离线答题搜题
勾选图标
扫码考试方便快捷
勾选图标
海量试题每日更新
波浪装饰图
欢迎登录试题通
可以使用以下方式扫码登陆
APP图标
使用APP登录
微信图标
使用微信登录
试题通小程序二维码
联系电话:
400-660-3606
试题通企业微信二维码