In order to better serve its customer needs, a manufacturer wants to change the design of one of its products, while minimizing time to market, this could best be accomplished with
答案解析
相关题目
In which of the following environments will the final assembly schedule normally correspond to the MPS?
I. Make-to-stock
II. Make-to-order
III. Assemble-to-order
The major advantage of a two level MPS process is which of the following?
Which of the following will result from the level strategy of production planning?
I. Production occurs at exactly the same rate as the sales forecast for each period.
II. Inventory will generally build.
III. The labor force and capacity usage remains stable.
Which of the following are included in a closed loop MRP system?
I. Master Production Scheduling
II. Capacity Requirement Planning
III. Purchasing
Period: 1 2 3 4 5
Forecast: 10 10 10 20 20
Orders: 8 6 6 2 2
PAB
MPS 30 0 0 0 0
On Hand 20
Based on the above MPS record, what is the non-cumulative ATP in Period 1?
Which of the following pieces of information must be available in order to prepare a realistic MPS?
I. Knowledge of all production requirements
II. Available capacity
III. Load profile of each MPS item
Which of the following statements are true regarding production planning?
I. It is senior management's responsibility.
II. The master scheduler should "disaggregate" the production plan to the master schedule.
III. It focuses corporate production goals.
If the master production schedule is overstated, which of the following will occur?
The frequency of revisions to a forecast should be:
Which of the following would be the best way to cope with the uncertainty of demand?