单选题

The most important reason for reporting and knowing throughput is

A
Throughput per hour can be used to monitor continuous improvement at a work center
B
Throughput is a good measure for reporting to external stakeholders
C
Throughput can vary due to the time period being reported when capacity is underutilized
D
Throughput measures capacity in addition to reporting production status

答案解析

正确答案:D

解析:

It is important to not only know throughput for current orders, but is useful for planning, scheduling and continuous improvement prioritization;
Different time period don’t change anything else; Rate per minute or hour is calculated, not reported;
题目纠错
CPIM PART2-供应链资格认证考试

扫码进入小程序
随时随地练习

相关题目

单选题

What should the level of accuracy be in a forecast?

单选题

In deciding which forecasting technique to use, a company's management must take many factors into account. Which of the following must be considered?
I. The cost versus the value of the forecast
II. The order promising policy
III. The degree of accuracy necessary

单选题

A panel of experts are assembled and asked to fill out questionnaires about your business. The questionnaires are then used to produce another set of questionnaires which are then distributed to the panel again. Which forecasting method is being used?

单选题

Long-range forecasts are associated with which of the following techniques?
I. A small number of products or families
II. Recurring or periodic data
III. Qualitative techniques are used more frequently than short range forecasts
IV. External data

单选题

If the sum of the forecast errors is 100 for four periods, what should the safety stock level be for a 95% service level? (Round to nearest whole number)

单选题

Every company should have a set of functional plans synchronizing activities across functions that specify production levels, capacity levels, staffing levels, funding levels, etc. to achieve the intermediate goals and objectives of the organization. This plan would be called the:

单选题

A distribution network structure is the:

单选题

In a make-to-stock company, distribution will divide the number of items (or dollars) shipped by the number of items (or dollars) that were supposed to ship. This measure is called the:

单选题

Which of the following environments would have the lowest production volume of each sales unit?

单选题

Which of the following is not a key element of demand management?

关闭登录弹窗
专为自学备考人员打造
勾选图标
自助导入本地题库
勾选图标
多种刷题考试模式
勾选图标
本地离线答题搜题
勾选图标
扫码考试方便快捷
勾选图标
海量试题每日更新
波浪装饰图
欢迎登录试题通
可以使用以下方式扫码登陆
APP图标
使用APP登录
微信图标
使用微信登录
试题通小程序二维码
联系电话:
400-660-3606
试题通企业微信二维码