The use of modular bills of material allows the master production schedule to:

A
use a final assembly schedule
B
be stated in fewer different units
C
not equal the production plan
D
use phantom bills of material

答案解析

正确答案:B

解析:

A modular bill of material allows the MPS to be stated in fewer units. This facilitates the MPS process by stating the MPS in the units which are sold, not in the units which are built. For example, instead of trying to MPS every car built, the MPS is for generic parts of a car such as the air conditioner, the tires, two doors, etc. When the customer specifies the actual options, the car is scheduled for assembly with the specific options defined.
题目纠错
CPIM PART2-供应链资格认证考试

扫码进入小程序
随时随地练习

关闭登录弹窗
专为自学备考人员打造
勾选图标
自助导入本地题库
勾选图标
多种刷题考试模式
勾选图标
本地离线答题搜题
勾选图标
扫码考试方便快捷
勾选图标
海量试题每日更新
波浪装饰图
欢迎登录试题通
可以使用以下方式扫码登陆
APP图标
使用APP登录
微信图标
使用微信登录
试题通小程序二维码
联系电话:
400-660-3606
试题通企业微信二维码