Which of the following problems can be corrected at the rough-cut capacity planning level?
I. Overloads at critical work centers
II. Excess capacity at any work center
III. Excess load versus plant capacity
答案解析
解析:
相关题目
If a company's design cycle is less than that of its competitors, which of the following statements would most likely be true?
Universal power supplies that can be set to different voltages based on the country the customer resides in is a sample of
A supplier that provides 100% acceptable quality products is providing
An effective way to improve the capability of production process equipment is
Visual management supports continuous improvement in which of the following ways?
Conveyors used as part of an assembly operation should be
A supplier has access to a customer's inventory data and is responsible for maintaining the inventory level required by a customer. The vendor reviews inventory on-site at the customer's location, restocks and then invoices the customer. The inventory is termed
Ensuring all customer needs are identified in an effort to solidify the product design is an example of the
The best way for a company to reduce the cost of quality and improve customer satisfaction is to
Which of the following results are goals of QFD?
1. Achieving SPC;
2. Understanding customer needs and wants;
3. Optimizing product and process designs;