A process train is a representation of the flow of materials through a process industry manufacturing system. Within this process train, equipment that performs a basic manufacturing step, such as mixing or packaging is called a:
答案解析
解析:
相关题目
Which of the following statements describes how capacity planning provides feedback to material planning for scheduling operations?
A scheduling technique that considers slack time to increase or decrease the calculated lead time of an order is
The ability of manufacturing to respond quickly to external or internal changes is
Loads in CRP in a well-run company are fairly balanced in the short-term but are dropping off later in the planning horizon. The most likely reason is
If a work center is overstated in terms of available production capacity
Which type of capacity is the best indicator that the material plan is infeasible if it equals the required capacity at a particular work center?
A work center has 4 employees that work 8 hour shifts with an utilization of 85%. Demand on the work center is 60 units. Takt time at the work center is
Since capacity has already been validated at the MPS level, why is it checked again at the MRP level?
The time when resources are not producing product is known as
Products that are usually manufacturing together because of product or process similarities are