Which of the following is used in conjunction with time phased MRP records and shop floor system records to calculate the capacity needed to produce both open shop orders and planned orders?
答案解析
解析:
相关题目
If a work center is overstated in terms of available production capacity
Which type of capacity is the best indicator that the material plan is infeasible if it equals the required capacity at a particular work center?
A work center has 4 employees that work 8 hour shifts with an utilization of 85%. Demand on the work center is 60 units. Takt time at the work center is
Since capacity has already been validated at the MPS level, why is it checked again at the MRP level?
The time when resources are not producing product is known as
Products that are usually manufacturing together because of product or process similarities are
A company has a mandate to meet schedule dates, CRP has identified a capacity overload, and it appears the product will be shipped late. Which of the following actions should be done first?
Which of the following benefits is the best use of a MRP simulation capacity?
An infinite capacity planning report would typically show what type of load profile?
CRP uses infinite rather than finite planning because