In an ETO environment, what determines the latest point at which the BOM can be completed and released to MRP?
答案解析
解析:
相关题目
What type of scheduling uses a particular operation to schedule from?
Company ABC is trying to calculate how much safety stock they should have for their highest selling product. With the following info calculate the safety stock.
Standard Deviation = 25
Safety Factor = 4.00
Lead Time = 4 weeks
Forecast of 250 per week
Which of the following is NOT included in manufacturing lead time elements?
When a non-bottleneck stops, what supply's the bottleneck work center?
Which of the following are basic methods of managing a contract?
1. Vendor scheduling
2. Direct shipment
3. Release system
Which of the following are lead time elements:
1. Set-up time
2. Buffer time
3. Run time
4. Drum time
All of the following are batching rules EXCEPT
At a restaurant, fresh vegetables would have the MOST cost associated to it?
Which of the following would NOT be a type of MRO Inventory?
Using the following table, calculate the Mean Absolute Deviation (MAD)
Period Forecast Actual
1 100 90
2 100 90
3 120 110
4 120 120
5 150 180
6 200 200
7 250 300
8 200 250
9 180 200
10 150 120
12 100 90
Total: 1790 1850