In a Kanban facility, production consists of machining or subassembly departments, with one final assembly line. An unit takes 5 days to complete. Department production is most likely reported
答案解析
解析:
BOM levels are not the same as routing steps and could not be implemented;
SPC operations may or may not have completed the part;
At time of shipment is too late for reporting purposes for machining or subassembly;
相关题目
The purpose of first article inspection is to verify the product's
The purpose of flow path lines on a process flow chart is
Variations in product design, process requirements or order quantities, require which of the following manufacturing processes?
Which of the following product layout will most likely contain dedicated lines?
Which of the following elements would have the most impact on reducing manufacturing lead time?
Which of the following changes would have an impact on the use of a production activity control system?
1. Changing from a batch to a line manufacturing environment;
2. Implementing modular bill of material for items with options;
3. Grouping production equipment into focused work cells;
Load leveling has which of the following benefits for scheduling?
Material consumed in a pull environment is determined by
Which of the follow aspects of a job most determine the day and time when it will be done?
Which of the following situations is most likely a reason for establishing order priorities with a FAS based on the internal measures, rather than on customer-oriented measures?