相关题目
Standard hours/part=0.1
Standard hours expected=7.2
Standard internal setup time=0.25 hours
Scheduled downtime=0
Actual run time=7 hours
Actual internal setup time=0.1hour
Total hours/shift=8
Resources=1
Shift/day=1
The utilization for the work center is
Feedback of production information in a company using Kanban is most likely to exclude
In a Kanban facility, production consists of machining or subassembly departments, with one final assembly line. An unit takes 5 days to complete. Department production is most likely reported
Production material is issued upon release of the order and costs are accumulated by department for a customer order based on direct material, direct labor and allocated overhead, direct cost would include
The primary goal of TOC is
A synchronized production principle that determines the size of the production batch as compared to other quantities is that is equal to
Overhead is allocated based on direct labor at a company maintaining a stable workforce with varied production rates. Which of the following incidents most likely occurred when overhead is under absorbed in month 2 as compared to over absorbed in month 1?
Which of the following techniques encourage suppliers to adopt lean principles?
To detect when a work center output might vary from the plan, the planner should compare
The Kanban system is responsible not only for implementing the production schedule but also?