Load leveling has which of the following benefits for scheduling?
答案解析
相关题目
Which of the following causes of variation does SPC attempt to detect, before defective items are produced?
Quality can be defined as
In TOC, which of the following actions best reduces WIP inventory on the shop floor?
A company operates in a MTO environment, and has departments with job shop layouts. On-time schedule performance, most commonly, is a function of
Standard hours/part=0.1
Standard hours expected=7.2
Standard internal setup time=0.25 hours
Scheduled downtime=0
Actual run time=7 hours
Actual internal setup time=0.1hour
Total hours/shift=8
Resources=1
Shift/day=1
The utilization for the work center is
Feedback of production information in a company using Kanban is most likely to exclude
In a Kanban facility, production consists of machining or subassembly departments, with one final assembly line. An unit takes 5 days to complete. Department production is most likely reported
Production material is issued upon release of the order and costs are accumulated by department for a customer order based on direct material, direct labor and allocated overhead, direct cost would include
The primary goal of TOC is
A synchronized production principle that determines the size of the production batch as compared to other quantities is that is equal to