Which of the following situations is most likely a reason for establishing order priorities with a FAS based on the internal measures, rather than on customer-oriented measures?
答案解析
相关题目
A term used to mean the actual output of production compared to the actual input of resources is
A company should use which of the following techniques to maintain control of a process?
Samples are plotted over time on a chart that includes the part's normal value, and upper and lower specification limits. The technique being used are
Which of the following causes of variation does SPC attempt to detect, before defective items are produced?
Quality can be defined as
In TOC, which of the following actions best reduces WIP inventory on the shop floor?
A company operates in a MTO environment, and has departments with job shop layouts. On-time schedule performance, most commonly, is a function of
Standard hours/part=0.1
Standard hours expected=7.2
Standard internal setup time=0.25 hours
Scheduled downtime=0
Actual run time=7 hours
Actual internal setup time=0.1hour
Total hours/shift=8
Resources=1
Shift/day=1
The utilization for the work center is
Feedback of production information in a company using Kanban is most likely to exclude
In a Kanban facility, production consists of machining or subassembly departments, with one final assembly line. An unit takes 5 days to complete. Department production is most likely reported