If a company would like to build up inventory to meet an expected seasonal demand, the inventory increase would first be loaded to the:
答案解析
解析:
相关题目
Which of the following benefits of setup reduction is most immediate?
A correct statement about the use of a bottleneck is
1 method for increasing throughput is
A piece of equipment is incapable of maintaining process control for longer than 4 hours and has become a bottleneck, due to unforeseen tooling wear. Tool sharpening requires 2 hours to sharpen and move back into production. Which of the following correctives actions should be done first?
Queue, setup, run, wait and move times are components of
Pulling together a cross function team to drive new product design is an example of
When using a six sigma problem solving approach, problems are identified using
When a failure becomes external, four viable mitigation options include
As a product or service matures, the organization's collective knowledge of risk prevention and mitigation will
Engineering has suggested that a company's products would provide more value to customers if they were capable of identifying and automatically reporting problems to service and repair associates. The most likely effect of this strategy would be
