Capacity requirements planning has been used to check the validity of the material plan, and no constraining work centers were identified, which of the following scenarios is most likely the reason?
答案解析
解析:
相关题目
An MRP system provides all of the following to the shop floor control system EXCEPT:
Which of the following is true regarding interlevel equilibrium?
I. The gross requirements correspond to the planned order release of its parent
II. Maintaining interlevel equilibrium requires partial explosions
III. It is a characteristic of regenerative MRP
Which of the following are reasons for using modular bills of material?
I. Disentangle option combinations
II. Segregate common from unique parts
Which of the following is true regarding pseudo bills of material?
I. They are never manufactured.
II. They are for transient assemblies.
III. They facilitate planning.
In an MRP implementation, which of the following methods are preferable in the cut-over phase?
All of the following are user responsibilities in maintaining an MRP system EXCEPT:
The time periods of the master production schedule must be identical to the:
An MRP project team leader should report to the:
Which of the following is true regarding phantom bills of material and phantom parts?
I. It is a bill of material for a transient assembly.
II. A phantom is never closed to or issued from stock.
In a net change MRP system, all of the following can trigger a re-planning run except:
I. Changes in product structure
II. Inventory on-hand balance adjustments
III. Changes in lead time