Which of the following reporting points is of use when determining run times?

A
Move complete
B
Setup complete
C
Partial quantity complete
D
Production order complete

答案解析

正确答案:D

解析:

Run time is calculated by multiplying the run time per piece by the size of the order, knowing when the order is completed can provide the run time per piece;
CPIM PART2-供应链资格认证考试

扫码进入小程序
随时随地练习

相关题目

单选题

Which of the following best describes the term "equal runout quantities"?

单选题

Which of the following conditions could occur if the bill of materials is inaccurate?

单选题

All MRP systems operate as exception systems. They generate messages to tell a planner when an out of limits condition is met. For which of the following conditions would an exception message be generated?
I. Planned orders have reached the lead time for ordering.
II. Scheduled receipts due dates are later than the need date.
III. Standard lead time for an end item will result in a late delivery.

单选题

In a net change MRP system, which of the following transactions will cause the system to replan the part?
I. Change in the bill of materials
II. Inventory write off
III. Unexpected demand for the part
IV. Change in the lead time

单选题

Which of the following best describes the process of order launching?

单选题

An MRP system provides all of the following to the shop floor control system EXCEPT:

单选题

Which of the following is true regarding interlevel equilibrium?
I. The gross requirements correspond to the planned order release of its parent
II. Maintaining interlevel equilibrium requires partial explosions
III. It is a characteristic of regenerative MRP

单选题

Which of the following are reasons for using modular bills of material?
I. Disentangle option combinations
II. Segregate common from unique parts

单选题

Which of the following is true regarding pseudo bills of material?
I. They are never manufactured.
II. They are for transient assemblies.
III. They facilitate planning.

单选题

In an MRP implementation, which of the following methods are preferable in the cut-over phase?

关闭登录弹窗
专为自学备考人员打造
勾选图标
自助导入本地题库
勾选图标
多种刷题考试模式
勾选图标
本地离线答题搜题
勾选图标
扫码考试方便快捷
勾选图标
海量试题每日更新
波浪装饰图
欢迎登录试题通
可以使用以下方式扫码登陆
APP图标
使用APP登录
微信图标
使用微信登录
试题通小程序二维码
联系电话:
400-660-3606
试题通企业微信二维码