Which of the following best describes the term "equal runout quantities"?

A
The date a product is due to be out of stock
B
The "use up before change" feature in the engineering change order
C
Order quantities of items in a group which will be depleted at the same time
D
The date by which obsolete inventory must be gone

答案解析

正确答案:C

解析:

The products are ordered in the right quantities so they will run out at the same time, leaving no residual inventory with a potential for obsolescence.
CPIM PART2-供应链资格认证考试

扫码进入小程序
随时随地练习

相关题目

单选题

Which of the following reporting points is of use when determining run times?

单选题

A work center is consistently overloaded to the point where overtime is required nightly and on weekends. This seems to be a problem for only this work center. The most likely reason is

单选题

Before delaying a master schedule item to balance load with capacity in a MTO environment, the planner should first check the

单选题

The manufacturing environment best suited for the introduction phase of a product's life cycle is

单选题

A company uses rated capacity for capacity requirements planning, which of the following statements is true?

单选题

When using capacity planning to validate the material plan, which of the following information is most critical?

单选题

A call center operates with 130 customer service representatives, in an 8 hour period. The company receives 8000 calls per day and the average call takes 7 minutes, the utilization of the call center is

单选题

The amount of scheduled work ahead of a manufacturing facility expressed in terms of hours of work or units of production is called

单选题

Run time = 15 minutes per piece
Setup time = 1 hour
Queue time = 8 hours
Move time = 8 hours
Quantity of order = 28 pieces
Using the information provided, calculate the total capacity requirement for a work center in hours;

单选题

A new product is being introduced to the company's product mix, which will have an effect on the current period material plan due to the cumulative lead time of the purchased parts. Which of the following actions would be of immediate value to the material planner?

关闭登录弹窗
专为自学备考人员打造
勾选图标
自助导入本地题库
勾选图标
多种刷题考试模式
勾选图标
本地离线答题搜题
勾选图标
扫码考试方便快捷
勾选图标
海量试题每日更新
波浪装饰图
欢迎登录试题通
可以使用以下方式扫码登陆
APP图标
使用APP登录
微信图标
使用微信登录
试题通小程序二维码
联系电话:
400-660-3606
试题通企业微信二维码