Before delaying a master schedule item to balance load with capacity in a MTO environment, the planner should first check the
答案解析
解析:
相关题目
Which of the following is/are a cost of inventory?
Which of the following would be impacted by a change in inventory value caused by a change in market value?
I. Balance sheet
II. Income statement
III. On hand inventory balance
IV. Cash flow statement
Which of the following best describes the term "equal runout quantities"?
Which of the following conditions could occur if the bill of materials is inaccurate?
All MRP systems operate as exception systems. They generate messages to tell a planner when an out of limits condition is met. For which of the following conditions would an exception message be generated?
I. Planned orders have reached the lead time for ordering.
II. Scheduled receipts due dates are later than the need date.
III. Standard lead time for an end item will result in a late delivery.
In a net change MRP system, which of the following transactions will cause the system to replan the part?
I. Change in the bill of materials
II. Inventory write off
III. Unexpected demand for the part
IV. Change in the lead time
Which of the following best describes the process of order launching?
An MRP system provides all of the following to the shop floor control system EXCEPT:
Which of the following is true regarding interlevel equilibrium?
I. The gross requirements correspond to the planned order release of its parent
II. Maintaining interlevel equilibrium requires partial explosions
III. It is a characteristic of regenerative MRP
Which of the following are reasons for using modular bills of material?
I. Disentangle option combinations
II. Segregate common from unique parts