AI智能推荐题库-试题通 AI智能整理导入题库-试题通
×
首页 题库中心 CPIM PART2-供应链资格认证考试 题目详情
C93BF00FBEF00001B89720C0D4CE1712
CPIM PART2-供应链资格认证考试
3,028
单选题

Which of the following benefits is the best use of a MRP simulation capacity?

A
Rescheduling orders to resolve a key work center overload problem
B
Determining the optimal order quantity required to maximize inventory turns
C
Determining the effect of the MPS on a bottleneck
D
Evaluating the number of standard deviations to protect via safety stock

答案解析

正确答案:A

解析:

MRP modeling is for the purpose of establishing the best schedule possible within the given constraints of demand and supply;
CPIM PART2-供应链资格认证考试

扫码进入小程序
随时随地练习

相关题目

单选题

There are occasions when the quality of a product will not meet specifications without rework. When this occurs, the product will go back through some of the same operations and maybe some new ones as well. Which of the following describes the best way to handle the rework, so as to be able to calculate the required capacity including the rework?

单选题

Which of the following could be an alternative way of dealing with capacity shortages?

单选题

When the MPS is infeasible to produce, which of the following techniques would be used to smooth the capacity requirements?

单选题

In a manufacturing operation, capacity to produce is available based on the machine availability. However, the machine requires a special mold which is being repaired, therefore the capacity to produce on the machine is constrained. This type of constraint is known as a:

单选题

There are multiple strategies in terms of planning capacity to ensure the capability of producing the planned production. One strategy is to employ a capacity cushion in which the available capacity is more than the needed capacity to meet the plan. The negative aspect of maintaining a capacity cushion is that it reduces:

单选题

Of the various capacity planning methods available for high level planning, which would be considered the simplest to establish and use?

单选题

To use a resource profile to generate rough-cut capacity plans, all of the following data is necessary EXCEPT:

单选题

Which of the following is used in conjunction with time phased MRP records and shop floor system records to calculate the capacity needed to produce both open shop orders and planned orders?

单选题

A listing of the required capacity and key resources needed to manufacture one unit of a selected item or family is best defined as:

单选题

When there are make-to-order and make-to-stock parts being manufactured using a single set of plant and equipment, it is known as:

关闭登录弹窗
专为自学备考人员打造
勾选图标
自助导入本地题库
勾选图标
多种刷题考试模式
勾选图标
本地离线答题搜题
勾选图标
扫码考试方便快捷
勾选图标
海量试题每日更新
波浪装饰图
欢迎登录试题通
可以使用以下方式扫码登陆
APP图标
使用APP登录
微信图标
使用微信登录
试题通小程序二维码
联系电话:
400-660-3606
试题通企业微信二维码