WORK CENTER 210 (in standard hours)
Period 1 2 3 4 5
PLANNED INPUT 150 150 150 150 150
ACTUAL INPUT 150 145 130
Period 1 2 3 4 5
PLANNED OUTPUT 180 180 180 180 150
ACTUAL OUTPUT 185 140 160
Based on the input/output control chart above, what should the input be in Period 4 in order to reduce the backlog?
答案解析
解析:
相关题目
Which of the following methodologies would be the most appropriately used during the design of a new product to ensure that it meets the customer needs?
The use of U-lines promotes all the following outcomes except
By implementing a supplier certification program, a company should be able to eliminate
A company's sustainability strategy first has an impact on
Group technology may be used to identify the physical similarity of manufactured parts. A major benefit of this would be facilitate
An effective quality process for product design includes which of the following activities?
Which of the following activities is a reportable occurrence by production?
MTTR-Mean time to repair is the average time
The House of Quality is part of which of the following processes?
Cooperation between partners within a supply chain can best be achieved by setting up multiple channels of